Elements |
GRI/SASB Codes |
Unit | FY 2022 |
---|---|---|---|
Endeavour Mining Sabodala |
|||
Environment | |||
Mining Production |
SASBCodes:
GRICodes:
|
||
Total ore processed (tonnes (t) ('000)) | Thousands | 6,248 | |
Total gold production | (ounces (oz)) | 271,832 | |
Energy Consumption | |||
Electricity efficiency | (kWh/t) | 19.89 | |
Energy consumption | (GJ) | 1,428,339 | |
Energy Intensity | |||
Energy intensity (per ounce of gold produced) | (GJ/oz) | 5.25 | |
Energy intensity (per tonne of ore mined) | (GJ/t) | 0.23 | |
GHG Emissions | |||
Total scope 1 and scope 2 GHG emissions ; | (tCO2e) | 117,601 | |
Scope 1+2 GHG intensity (per ounce of gold produced) | (tCO2e/oz) | 0.43 | |
Scope 1+2 GHG intensity (per tonne of ore mined) | (tCO2e/t) | 0.02 | |
Total scope 1, scope 2 and scope 3 GHG emissions | (tCO2e) | 117,601 | |
Scope 1+2+3 GHG intensity (per ounce of gold produced) | (tCO2e/oz) | 0.43 | |
Scope 1+2+3 GHG intensity (per tonne of ore mined) ( | tCO2e/t) | 0.02 | |
Water Withdrawal & Consumption | |||
Total water withdrawal for use | (ML) | 1,862.16 | |
Water withdrawal intensity (per ounce of gold produced) | (ML/oz) | 0.0069 | |
Total water consumed | (ML) | 1,862.16 | |
Water consumption intensity (per ounce of gold produced) | (ML/oz) | 0.0069 | |
Water reused and recycled as % of withdrawal | 82% | ||
Environmental Incidents | |||
Critical - 5 | 0 | ||
Major - 4 | 0 | ||
Moderate - 3 | 0 | ||
Minor - 2 | 0 | ||
Insignificant - 1 | 13 | ||
Tailings & Waste Management | |||
Non-Mineral Wastes | |||
Total non-hazardous waste generated | (tonnes (t)) | 799 | |
Total non-hazardous waste generated (per ounce of gold produced) | (tonnes/oz) | 0.0029 | |
Total hazardous waste generated | (tonnes (t)) | 852 | |
Total hazardous waste generated (per ounce of gold produced) | (tonnes/oz) | 0.0031 | |
Waste recycled | (%) | 59% | |
Mineral Wastes | |||
Tailings produced | (tonnes ('000) (t)) | 6,248 | |
Tailings produced (per ounce of gold produced) | (tonnes ('000)/oz) | 0.0230 | |
Closure Planning | |||
Operations with closure plans | Yes |